Đơn vị: ERLA — BQLVH Long An · ECP — BQLVH Vinh Bấm một tuần trong bảng để lọc biểu đồ + chi tiết theo dòng.
Tasks per week — total raised, segmented by completed vs outstanding
How this is read
For each week, two stacked bars side-by-side: left = ERLA (Long An), right = ECP (Vinh). Each bar's height = tasks that site raised that week. Each bar is segmented: completed (emerald for LA, blue for Vinh) at the bottom + outstanding (amber for LA, red for Vinh) on top. "Outstanding" = the "SL chưa hoàn thành đến nay" snapshot from that week's own report — point-in-time, not cumulative. Completed = raised − outstanding. Source: weekly .xlsx files in /OMNI - SITECHECK/THÁNG N.
Weekly summary table — crosscheck against source file
The source column names each weekly file. Numbers come from the "BẢNG TỔNG HỢP" sheet of each weekly file. Click any column header to sort.
Week↕
Source file↕
ERLA↕
ECP↕
ERLA open↕
ECP open↕
Status↕
Click any row in the weekly table above to drill the three charts and the row-level task table below into that week. Chi tiết theo dòng có ở hầu hết các tuần (the team converted .xlsb → .xlsx on 21 May 2026). Feb W2 ’26 is the only gap — that week had no standalone source file.
Status breakdown Jul W5 ’26
No row-level data for this week
By handling dept Jul W5 ’26
No row-level data for this week
By area Jul W5 ’26
No row-level data for this week
Row-level detail below — defaults to Jul W5 ’26. Click any week row above to drill in. Area + issue text reproduced verbatim from source.