Rà soát KSNB · Khối Vận Hành OMNI

OMNI Sitecheck — Điều hành

Đang tải dữ liệu…
Đơn vị: ERLA — BQLVH Long An · ECP — BQLVH Vinh
Bấm một tuần trong bảng để lọc biểu đồ + chi tiết theo dòng.

Tasks per week — total raised, segmented by completed vs outstanding

How this is read For each week, two stacked bars side-by-side: left = ERLA (Long An), right = ECP (Vinh). Each bar's height = tasks that site raised that week. Each bar is segmented: completed (emerald for LA, blue for Vinh) at the bottom + outstanding (amber for LA, red for Vinh) on top. "Outstanding" = the "SL chưa hoàn thành đến nay" snapshot from that week's own report — point-in-time, not cumulative. Completed = raised − outstanding. Source: weekly .xlsx files in /OMNI - SITECHECK/THÁNG N.

Weekly summary table — crosscheck against source file

The source column names each weekly file. Numbers come from the "BẢNG TỔNG HỢP" sheet of each weekly file. Click any column header to sort.
Week↕ Source file↕ ERLA↕ ECP↕ ERLA open↕ ECP open↕ Status↕
Click any row in the weekly table above to drill the three charts and the row-level task table below into that week. Chi tiết theo dòng có ở hầu hết các tuần (the team converted .xlsb → .xlsx on 21 May 2026). Feb W2 ’26 is the only gap — that week had no standalone source file.

Status breakdown Jul W5 ’26

By handling dept Jul W5 ’26

By area Jul W5 ’26

Row-level detail below — defaults to Jul W5 ’26. Click any week row above to drill in. Area + issue text reproduced verbatim from source.
Site↕ Vị trí / khu vực↕ Mô tả vấn đề / lỗi / rủi ro↕ Bộ phận xử lý↕ Phương án xử lý↕ Tình trạng xử lý↕